Menu Holden Logo

holden.wiki

Home Main Menu
Home Main Menu
  • MODEL SELECTION INDEX
  • ACCESSORIES FITTING INSTRUCTIONS
  • AIR CONDITIONING FITTING INSTRUCTIONS - C24NE MY2004
    • CONTENTS
    • 1 PREPARATION
      • 1.1 Preparation
      • 1.2 Points to Check
      • 1.3 Installation Precautions
      • 1.4 Torque Chart Hose & Tube Fittings
      • 1.5 Labels
      • 1.6 Parts
      • 1.7 Special Tools Required For Installations
    • 2.0 SPECIFICATIONS
    • 3.0 TIGHTENING TORQUES
    • 4.0 EVAPORATOR ASSEMBLY FITMENT
      • 4.1 - Parts To Be Removed
      • 4.2 - Evaporator Installation
    • 5.0 CONDENSER FITMENT
    • 6.0 COMPRESSOR FITMENT
    • 7.0 LIQUID LINE FITMENT
      • 7.1 Section 1 Of Liquid Line
      • 7.2 Section 2 Of Liquid Line
      • 7.3 Section 3 Of Liquid Line
    • 8.0 SUCTION LINE
    • 9.0 DISCHARGE LINE FITMENT
    • 10.0 RUBBER SEAL INSTALLATION
    • 11.0 DRIVE BELT PLACEMENT
    • 12.0 RELAY INSTALLATION
    • 13.0 EVACUATION & CHARGING PROCEDURE - R134a
    • 14.0 ELECTRICAL
    • 15.0 FAULT SOLUTIONS
      • INSTALLATION CHECKLIST
Made by Mibble ♥