
SECTION 5A - BRAKES
1. GENERAL INFORMATION
1.1 MASTER CYLINDER - PRINCIPLES OF OPERATION
DESCRIPTION
CONSTRUCTION
OPERATION
PRESSURE DIFFERENTIAL SPOOL VALVE OPERATION
1.2 LOAD SE NSING PROPORTIONING VALVE -
PRINCIPLES OF OPERATION
CONSTRUCTION
OPERATION
2. SERVICE OPERATIONS
2.1 MASTER CYLINDER
REMOVE
DISASSEMBLE
CLEAN AND INSPECT
REASSEMBLE
REINSTALL
2.2 LOAD SENSING PROPORTIONING VALVE
REMOVE
REINSTALL
3. TORQUE WRENCH SPECIFICATIONS